How to acclimate hardwood flooring.
Installing hardwood floors when raining.
If the hardwood flooring installation is done either in the summer or the spring then your floors might become vulnerable to distortion as these seasons have the highest humidity levels.
Typically used for engineereed hardwood staple down installation works well with 3 8 5 8 inch flooring.
Wed aug 04 2004 10 08 pm posts.
Inside the boxes make sure the room or level where the flooring will be laid is an enclosed space.
In other words let the heat or air run as it would normally for at least 5 days.
As long as it acclimated to the house and the temp amd humidity of the house.
Hardwood floors are durable beautiful and a great diy project.
Start the installation at the longest unobstructed wall.
Next using your hammer insert a nail 1 inch from the wall and about every 4 inches along the board.
Here s how to install flooring using the staple down method.
Begin with the first row pre drilling holes.
Note that this protocol should be followed year round not just during the summer when the humidity levels are high.
Favorite answer no go ahead and install it as long as the laminate isn t wet.
Remove the shoe molding and snap a chalk line 3 8 out from the baseboard this allows for expansion in the hot humid weather and contraction in the colder drier weather of the hardwood flooring.
You ll want to measure the hardwood floor moisture levels during at least four d ifferent points in the installation process.
Between 5 and 10 days ahead of time check to see if the temperature and humidity of the space is at normal living conditions.
Any flooring questions you can e mail me.
Learn how to install solid hardwood flooring with a few simple tools.