In order to meet minimum installation requirements for moisture content materials should be delivered 72 hours prior to installation or as long as necessary for the hardwood flooring to acclimate.
Installing engineered hardwood flooring nail down.
What s the best glue for your engineered wood flooring.
Plan to nail down the engineered hardwood flooring when you have a wood subfloor.
Tongue and groove flooring staple nail down.
Walk over every inch of the floor listening for squeaks.
Add a box extender to the floor receptacles as code requires.
As long as you use the correct pneumatic nail gun this technique provides the installer with a simple and controlled approach to the installation.
Before you nail down hardwood flooring must be stored in a controlled environment within the above mentioned temperature and humidity.
If possible this is the ideal installation method.
Engineered hardwood floors may be installed over wood subfloors using staples or flooring cleats.
Installing a nail down engineered hardwood floor step 1.
When you nail tongue and groove flooring properly the nails are invisible so american floor installers call the process.
Wherever the existing wood flooring is loose batten it down with ring shank nails or phillips head screws and set them flush.
For instance solid hardwood flooring is typically nailed down during installation while tongue and groove engineered flooring is usually clicked together or completely glued down.
Nail down the first row for your first row face the tongue toward the center of the room pre drilling and nailing with finishing nails about 1 inch in from the wall.
Fasteners should penetrate at least inch into the floor framing.
If you re installing engineered hardwood floors please refer to the staple down instructions.
The type of installation you choose will depend on your subfloor budget lifestyle and the type of wood flooring you select.
Nail down installation nail installation is a method commonly used for solid hardwood floors.
It follows the same method as staple down installation but you use a wood flooring cleat rather than a stapler.
Tongue and groove milling is highly versatile allowing the floors to be stapled or nailed down glued and sometimes floated.
When installing engineered wood planks or strips by nailing or stapling it is necessary to use the proper type of flooring stapler or nailer made for the thickness of the engineered wood flooring that is being installed.