Read on to see how to install a floating engineered wood floor.
Installing engineered hardwood floating on concrete.
Installing a floating engineered hardwood floor works well at any grade level and over most types of subfloor surfaces.
Engineered wood flooring offers the timeless look of hardwood but is perfect for basements and other areas where moisture can be an issue.
Made from layers of real wood compressed together engineered hardwood floors are better able to handle changes in moisture and humidity than solid hardwood.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
Engineered flooring goes down over a thin foam sheet which provides cushioning and sound dampening.
Follow these steps to install an engineered wood floor in your home.
Other products are better suited for a nail down installation where they are secured to a wood subfloor with nails or staples.
If you ve decided to install engineered hardwoods there are four possible installation methods depending on the subfloor.
Cost.
To learn about our products standards and warranties send us an email or call 1 800 832 9023 mon fri 8 a m.
Engineered wood flooring offers the timeless look of hardwood but is perfect for basements and other areas where moisture can be an issue.
A floating engineered wood flooring installation on concrete can be an excellent choice if your subfloor is below grade.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
How to install a base for a concrete floor.
Read manufacturer s directions before installation to maintain warranty coverage.
When working on a clean concrete subfloor the glue down method is often the go to choice.
Installing hardwood flooring over concrete.
Installing a hardwood floor over a concrete slab even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
Chesapeake hickory plank in cherry spice from mannington.
Glue nail staple and float.
Cost skill level.
When installing engineered hardwood floors over radiant heated subfloors turn the heat off for 24 hours before during and after installation.
The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.